Florida's Best PoolsTraining Academy
Module 10 · 10 chapters · ~3 hrs

Pool Startups

Proper activation and 90-day treatment for new or resurfaced pools to cure surfaces safely.

Module 10: Pool Startups
Module chapters

What you'll learn in this module

Each chapter below corresponds to one lesson or video. Links marked with → take you into our reference library for a deeper write-up on the same topic.

  1. 01
    Pre-Fill Preparation and Fill Day
    Source water testing, equipment setup, and why a continuous fill matters.
    Coming soon
  2. 02
    Initial 28-Day Intensive Startup Phase
    Daily brushing, acid/alkalinity, calcium sequestration, NPC method.
    Open →
  3. 03
    Chemical Balancing Timeline (Days 1-30)
    pH/TA priority, sequesterants, gradual sanitizer introduction.
    Coming soon
  4. 04
    Mid-Term Monitoring (Days 30-60)
    Stabilizing chlorine/CYA, hardness control, weekly testing.
    Coming soon
  5. 05
    Long-Term Stabilization (Days 60-90)
    Full system checks, client education, warranty tips, handover to regular service.
    Coming soon
  6. 06
    Surface-Specific Startup Variations
    Plaster, Pebble, Quartz — each has its own startup rules.
    Open →
  7. 07
    Source Water Analysis and Pre-Treatment
    Testing fill water and pre-treating for metals, hardness, or high pH.
    Coming soon
  8. 08
    Brushing and Vacuuming Schedules During Cure
    Daily brushing, vacuum-to-waste, and why filter choice matters during startup.
    Open →
  9. 09
    Avoiding Common Mistakes
    Early automation, over-acidification, and the 5 mistakes that ruin plaster.
    Open →
  10. 10
    Documentation and Client Communication
    What to record and report during startup to protect the warranty.
    Coming soon

Want this curriculum delivered to your team?

We license the Training Academy (with your branding and internal assessments) to Florida pool-service companies. Drop us a line to talk.

Talk About Team TrainingBack to All Modules